New Racing Loft
6/27/03, I started on the new Racing Loft. It will look just like my "Starter Loft" only bigger. It will be 8 by 40 feet. An OB section on the left with 24 nest boxes, a YB section on the right with 72 perches. I need to finish this loft before we move to house the birds while I am building the new Breeding Loft. Both lofts will be built on concrete slabs with in floor hot water radiant heat.
|
|
|
|
|
Corporate headquarters of "Red Rose Construction" note the Honda generator to run the all important "Coffee Maker" |
Red Rose Construction "CEO" Steve Joneli, in his office. |
Forms for the new racing loft. It will be built on a concrete slab with hot water in floor radiant heat. |
|
|
|
|
|
Steve Joneli and Don Chapin, CORP Flyer and chief Loft Building Inspector. |
Forms for the concrete slab, with Radiant heat Tubing, ready to poor. |
Jerry Dodson and his son pouring the concrete |
|
|
|
|
|
Pouring concrete |
And still more concrete |
The finisher loft floor |
|
|
|
|
|
Fred Farrish, CORP flyer and chief "Framer" |
The loft is framed, sheeted inside, ready for trusses and siding. |
Same time, different view. |
|
|
|
|
|
Steve's OB loft on the loft, Linda's YB loft on the right. |
Siding installed, ready for the trusses. |
Trusses installed, roof sheeting going on. |
|
|
|
|
|
Bob Brummigen, CORP Flyer and chief Roofing Specialist |
Our new neighbor kids Charlie and TJ, who were a big help. |
Charlie and TJ's sister Michelle, who also was a mighty big help. |

Here it is, All Done
|
|
|
|
|
Inside the OB loft, two sections of 12 nest boxes each. Still need to add nest box fronts. |
One of the two sliding doors closed. This one is between the two sections of nest boxes. |
Second door part way closed. Pictures taken from utility room. |
|
|
|
Nest fronts installed, All Done! |